Tamaño de papel
Nombre Clase Fecha

Franz Ehrlich, CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM (1959), Bauhaus Dessau Foundation. Reproducido con fines de referencia; todos los derechos reservados por el titular. Observe este lienzo bajo una luz en movimiento: el dibujo, el color real bajo el barniz, el pigmento puro

Datos clave

Artista
Franz Ehrlich wahooart.com/es/artists/franz-ehrlich_es/
Fechas del artista
1907 – 1984
Pintura al óleo
1959
Técnica y materiales
Ink On Paper
Tamaño original
49 x 84 cm
Movimiento
Bauhaus
Época
Modern
Celebrado en
Bauhaus Dessau Foundation wahooart.com/es/museums/bauhaus-dessau-foundation-dessau-rosslau_es/
Notable elements
Tables, diagrams, and charts
Subject or theme
Investment project construction schedule

En contexto

CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM — Franz Ehrlich

Dimensiones

Las medidas originales son 49 × 84 cm (alto × ancho), representadas aquí junto a un adulto de estatura media.

¿Cuándo se pintó esta obra?

  1. 1900
  2. 1910
  3. 1920
  4. 1930
  5. 1940
  6. 1950
  7. 1960
  8. 1970
  9. 1980

Fila superior: los años. Fila inferior: la edad del artista al inicio y al final de cada periodo — 0 al nacer, 77 al morir.

Pintado cuando el artista tenía 52. El artista vivió hasta los 77. 27 de las 81 obras fechadas de este artista en nuestro catálogo son anteriores.

Sombreado: la trayectoria de Franz Ehrlich (1907–1984) ▲ esta obra, 1959 cada pintura fechada, década tras década

Primeras obras: hasta 1952 Años principales de actividad: 1952–1970 Obras tardías: desde 1970

Estas tres franjas dividen las obras de este catálogo que cuentan con una fecha en un primer cuarto, una mitad central y un último cuarto. No representan la producción completa del artista: un periodo breve puede ser un vacío en el registro más que una etapa de inactividad. Los mismos años con la vida del artista trazada en ellos

Comparar con

Elige una de las obras anteriores: menciona dos cosas que comparta con esta y una diferencia.

Más obras para acompañar a esta: wahooart.com/es/art/similar/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/

Colores

Medido a partir de la imagen

    Color principal

    Gray #888571

    Paleta catalogada

    • #888571
    • #6C6957
    • #414139
    • #7B7864

    Estos colores integrados en toda la paleta del artista Encuentra otras pinturas por color

    Paleta
    Monochrome La gama cromática dominante en la imagen.
    Nombre del color principal
    Gray
    Intensidad
    Balanced Qué saturados y variados son los colores, desde un único tono tenue hasta una gran variedad de tonos brillantes.
    Contraste
    Serene El grado de diferencia entre los colores en cuanto a luminosidad y saturación a lo largo de la obra.
    Armonía
    Unified Palette El grado de armonía entre los colores, desde el contraste hasta la total unidad.
    Brillo
    Bright El grado de luminosidad o oscuridad general de la imagen, desde las sombras profundas hasta las luces intensas.
    Saturación
    Muted Qué puros y fuertes son los colores, desde un gris casi tenue hasta una viveza total.

    ¿En qué parte del mundo se contempla esta pintura?

    • menos del 1%
    • 1–3%
    • 3–8%
    • 8–20%
    • 20% o más
    Esta pintura por sí sola cuenta con muy pocos visitantes registrados para realizar un mapeo, por lo que la lámina muestra cada obra de Franz Ehrlich durante los últimos doce meses: 4 países en total. Origen de estas cifras

    Los diez principales países

    1. 1 China 83,8%3 100 visitas
    2. 2 Estados Unidos 10,8%400 visitas
    3. 3 Hong Kong 2,7%100 visitas
    4. 4 Japón 2,7%100 visitas

    Localiza los tres países más oscuros en el mapa. ¿Se encuentra alguno de ellos en el país donde se custodia esta pintura? Escribe una razón por la cual personas de lugares lejanos podrían viajar para verla.

    Las 20 obras más vistas de Franz Ehrlich

    1. 1 El pequeño hogar en el bosque cerca de Berggiesshübel (Planos arquitectónicos, vistas, sección y plano de diseño), 1947 7,7%300 visitas
    2. 2 63 - 64 (Painting with violin, New Year, 1964 7,7%300 visitas
    3. 3 LIVING ROOM CABINET 5,1%200 visitas
    4. 4 Planos de habitaciones dormitorio (con muebles interiores), 1962 5,1%200 visitas
    5. 5 Painting with violin, 1979 5,1%200 visitas
    6. 6 3 panels 72/51 5,1%200 visitas
    7. 7 A.D.W. MAIN BUILDING 2 BASEMENT STOREYS 1RST WORKING DESIGN (Academy of Sciences, floor plan), 1976 2,6%100 visitas
    8. 8 A.D.W. MAIN BUILDING GROUND FLOOR 1RST WORKING DESIGN V.2 (Academy of Sciences, floor plan), 1976 2,6%100 visitas
    9. 9 A.D.W. MAIN BUILDING 1RST TOP FLOOR 1RST WORKING DESIGN (Academy of Sciences), 1976 2,6%100 visitas
    10. 10 BASIC SCHEME FOR ROOM UNITS AND UTILISATION IN THE HV HOUSE (Trading House Berlin), 1974 2,6%100 visitas
    11. 11 1 pieza archivador (con pies de acero tubular y tablero de mármol, 1981 2,6%100 visitas
    12. 12 HKB II - NUEVO CONSTRUCCIÓN PRIMER PISO (Ministerio del Interior, Berlín, planta baja), 1950 2,6%100 visitas
    13. 13 800 YRS. DAS BUCH [THE BOOK]. GROUND PLAN AND VIEWS (Exhibit display racks, Leipzig Trade Fair), 1964 2,6%100 visitas
    14. 14 SALES COUNTER, 1957 2,6%100 visitas
    15. 15 1rst Front door project (Baumann House, Berlin), 1962 2,6%100 visitas
    16. 16 110.4% plan fulfilment in Leipzig. Report by Leipzig City Council (Brochure), 1949 2,6%100 visitas
    17. 17 800 YRS. WALL 4 + 5. GROUND PLAN AND VIEWS (Exhibit display racks, Leipzig Trade Fair), 1964 2,6%100 visitas
    18. 18 Libro Hauptstraße / Sección transversal (FDGB Libro Gutenberg Dresden Hauptstraße 30), 1949 2,6%100 visitas
    19. 19 Table and chair for dining room, 1954 2,6%100 visitas
    20. — CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM, 1959 esta obra 0,0%0 visitas

    En conjunto, estas obras representan el 69,6% de toda la atención que recibieron las pinturas de este artista durante los últimos doce meses. El catálogo contiene 101 obras de este artista, de las cuales 31 fueron consultadas al menos una vez. Esta pintura aún no ha recibido visitas en ese periodo; cierra la lista sin una clasificación. Los mismos datos, mes a mes

    Las barras miden la atención, no la calidad. Elige la obra de arriba y esta otra: menciona un factor que podría hacer que una pintura sea famosa más allá de su técnica.

    Sobre esta obra

    CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM — Franz Ehrlich

    The Precision of Progress: A Blueprint of Visionary Intent

    In the intersection of architectural rigor and graphic artistry lies a remarkable piece of mid-century documentation: CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. Created in 1959 by the master of form, Franz Ehrlich, this work transcends its utilitarian origins to become a captivating study of order and anticipation. At first glance, the viewer is met with an intricate tapestry of tables, diagrams, and charts that map out the birth of a media space. It is not merely a schedule; it is a visual manifesto of structural possibility, where every line and cell serves as a heartbeat in the rhythm of industrial progress.

    The painting, executed on paper with a delicate yet commanding presence, measures 49 x 84 cm, offering a panoramic view into the meticulous mind of its creator. Ehrlich utilizes a technique that blends the precision of technical drafting with the expressive soul of graphic design. The composition is dense with information, yet it maintains a rhythmic balance that guides the eye through a labyrinth of data. For the collector or interior designer, this piece offers a sophisticated geometric complexity that serves as a stunning focal point in modern, minimalist, or industrial-themed spaces, providing a sense of intellectual depth and structured elegance.

    A Legacy Forged in Bauhaus Discipline

    To understand the soul of this work, one must look to the hands that held the pen. Franz Ehrlich was a product of the legendary Bauhaus Dessau, an institution that redefined the relationship between art, craft, and industry. Having studied there between 1927 and 1930, Ehrlich carried the avant-garde principles of functionalism and clarity into his later works. This specific piece, created decades after his formative years, reflects a matured mastery of the Bauhaus ethos—the idea that beauty is found in the most efficient and logical arrangement of elements.

    The historical context of 1959 adds a layer of profound gravity to the work. Living through the turbulent shifts of mid-century Germany, Ehrlich’s work often mirrored the tension between individual creativity and the collective necessity of reconstruction and planning. The subject matter—the implementation of TV studios—speaks to an era of burgeoning communication and the technological optimism of the post-war period. There is a quiet heroism in these charts; they represent the blueprint for a new way of seeing the world through the lens of emerging mass media.

    The Aesthetic of Order and Emotional Resonance

    Beyond its technical merits, the artwork possesses an evocative emotional impact that resonates with anyone moved by the beauty of logic. There is a certain serenity found in its absolute organization. The repetition of tables and the structured flow of diagrams create a meditative quality, inviting the viewer to lose themselves in the details of the project's timeline. It evokes a sense of nostalgia for an era when progress was measured in tangible, meticulously planned steps.

    For those seeking to adorn a curated collection or a professional studio, this reproduction offers more than just decoration; it offers a conversation piece that bridges the gap between historical documentation and fine art. The interplay of light and shadow within the intricate linework provides a tactile richness that makes every viewing a new discovery. It is a celebration of the architect's vision—a moment frozen in time where the future was being carefully, beautifully constructed.

    Artista y museo

    Artista

    Franz Ehrlich

    Nacido en Leipzig, Alemania

    Early Life and Education

    Franz Ehrlich, a name synonymous with both architectural innovation and poignant historical experience, was born in 1907 in Reuth, Germany – a small town nestled within the landscape of Bavaria. From his earliest years, a deep-seated passion for the arts ignited within him, a spark that propelled him towards formal training. He wasn’t simply drawn to aesthetics; there seemed to be an innate understanding of form and structure, a desire to translate visual concepts into tangible realities. This inclination led him to enroll at the prestigious Bauhaus in Dessau, a crucible of modern art and design, from 1927 to 1930. The Bauhaus wasn’t merely a school; it was a revolutionary movement, a laboratory for experimentation where traditional artistic boundaries were relentlessly challenged. Here, under the tutelage of masters like Walter Gropius, László Moholy-Nagy, Paul Klee, and Joost Schmidt, Ehrlich honed his skills in architecture, graphic design, and sculpture, absorbing the principles of functionalism, geometric abstraction, and a profound belief in art’s ability to serve humanity. The Bauhaus experience fundamentally shaped his artistic perspective, instilling within him a commitment to both beauty and social responsibility – values that would profoundly influence his subsequent work.

    Artistic Career and Communist Affiliation

    Ehrlich's artistic journey was inextricably linked to the turbulent political climate of Weimar Germany. His affiliation with the communist party proved to be a defining moment, one that dramatically altered the course of his life and career. In 1935, he faced arrest and imprisonment by the rising Nazi regime, an event that forced him into hiding and ultimately led to a period of profound hardship and displacement. Despite these immense challenges, Ehrlich refused to abandon his artistic pursuits. He continued to create, driven by a deep sense of conviction and a desire to express his beliefs through his art. This resilience in the face of adversity is perhaps one of the most remarkable aspects of his biography. His work during this period reflects a heightened awareness of social injustice and political oppression – themes that would continue to resonate throughout his career. The experience of persecution instilled within him a profound empathy for those marginalized by society, informing his design choices and artistic vision.

    Notable Works

    Ehrlich’s oeuvre is characterized by a remarkable blend of architectural innovation, graphic design expertise, and sculptural experimentation. Several projects stand out as particularly significant contributions to the world of art and design. “800 YRS. FRAMEWORK WALL 3” (Leipzig Trade Fair), for example, showcases his ability to integrate form and function in a striking display rack, demonstrating a mastery of spatial relationships and material manipulation. His execution plan for Professor Dr. Baumann’s house exemplifies his meticulous attention to detail and his understanding of architectural principles. Perhaps most intriguing is “1933” – a photo-sculptural advertising project that brilliantly combined photography with sculpture, creating a unique visual language that captured the spirit of the era. These projects, along with others such as the design for the entrance gate inscription at Auschwitz (“Jedem das Seine”), reveal a complex and deeply thoughtful artist grappling with profound social and political issues.

    Museums and Collections

    Ehrlich’s artistic legacy is preserved in several key institutions around the world. The AllPaintingsStore.com website offers an extensive collection of his works, providing a valuable resource for researchers and art enthusiasts alike. Furthermore, the Bauhaus Dessau Foundation (Dessau-Roßlau, Germany) serves as a vital repository of his architectural drawings, models, and other archival materials, offering invaluable insights into his creative process. The foundation’s commitment to preserving and interpreting the Bauhaus legacy ensures that Ehrlich's contributions to modern design continue to be recognized and celebrated. His work is also featured in various exhibitions and collections internationally, solidifying his place as a significant figure in 20th-century art and architecture.

    Legacy and Impact

    Franz Ehrlich’s life story is more than just the chronicle of an artist; it's a poignant reflection of Germany’s tumultuous history during the first half of the 20th century. His experiences – from his formative years at the Bauhaus to his imprisonment under the Nazi regime and his subsequent work in East Germany – offer a powerful lens through which to examine the intersection of art, politics, and social justice. He wasn't simply an architect or designer; he was a witness to history, a participant in resistance movements, and a creator whose work bore testament to both the beauty and the brutality of his time. His legacy endures not only through his architectural designs and graphic works but also as a symbol of resilience, creativity, and unwavering commitment to human dignity.

    Museo

    Bauhaus Dessau Foundation

    En exposición en Dessau-Roßlau, Alemania

    El Legado Radical de la Bauhaus Dessau: Un Viaje a la Vanguardia del Diseño

    En el corazón de Dessau-Roßlau, en Sajonia-Anhalt, se alza un edificio que trasciende su mera función arquitectónica para convertirse en un símbolo de una revolución estética y social. La Bauhaus Dessau Foundation no es simplemente un museo; es la puerta de entrada a un universo donde la artesanía, la tecnología y el arte convergen en una búsqueda incesante de la belleza funcional y la armonía integral. Fundada en 1994, esta institución vital revive el espíritu pionero de la escuela que, durante apenas una década, transformó radicalmente el panorama del diseño y la arquitectura a principios del siglo XX.

    La historia de la Bauhaus es intrínsecamente ligada a su fundador, Walter Gropius. Tras el cierre abrupto de la escuela original en 1933, la fundación de esta nueva institución representó un acto de voluntad para preservar y continuar el legado de una generación de artistas e intelectuales que desafiaron las convenciones establecidas. El edificio, diseñado por Gropius mismo, es una obra maestra de la arquitectura moderna: una síntesis audaz de líneas limpias, espacios abiertos y materiales innovadores como el vidrio y el acero. Cada elemento del diseño refleja los principios fundamentales de la Bauhaus – la unidad de las artes, la importancia de la producción industrial y la búsqueda de soluciones prácticas para la vida cotidiana.

    Un Tesoro Inigualable: La Colección “Versuchsstätte Bauhaus”

    El núcleo de la colección de la Bauhaus Dessau Foundation reside en su impresionante archivo, que alberga más de 50.000 objetos – desde bocetos y prototipos hasta muebles, textiles y obras de arte originales. Sin embargo, la joya de la corona es la exposición permanente “Versuchsstätte Bauhaus. The Collection”, una experiencia inmersiva que desvela el funcionamiento interno de la escuela. En lugar de centrarse en las icónicas piezas de diseño, esta exhibición se adentra en los detalles más íntimos del proceso creativo: las lecciones, los talleres y la vida cotidiana de los estudiantes y profesores.

    Aquí, se puede apreciar la meticulosa atención al detalle que caracterizó a la Bauhaus. Se exhiben ejemplos de textiles diseñados por Anni Albers, que fusionaron la artesanía tradicional con el diseño moderno abstracto; se revelan las innovadoras soluciones constructivas propuestas por Hannes Meyer; y se exploran los experimentos con materiales y técnicas de producción. La colección no solo celebra los logros artísticos de la Bauhaus, sino también su espíritu experimental y su compromiso con la innovación constante.

    Exposiciones que Desafían el Presente

    La Bauhaus Dessau Foundation no se limita a exhibir un archivo histórico; es un espacio vivo y dinámico donde se exploran los desafíos del presente a través de la lente de la visión Bauhaus. A lo largo del año, la fundación organiza una amplia variedad de exposiciones, talleres, conferencias y eventos que abordan temas como la sostenibilidad, el diseño urbano, la arquitectura social y las nuevas tecnologías. Estas iniciativas fomentan el diálogo entre artistas, diseñadores, arquitectos y ciudadanos, buscando soluciones creativas para los problemas más apremiantes de nuestra época.

    Entre las exposiciones destacadas se encuentra “Bauhaus Ecologies”, que explora la relación entre la Bauhaus y la sostenibilidad, y “Masters’ Houses”, que ofrece una visión íntima de las viviendas diseñadas por los maestros de la Bauhaus. Además, la fundación organiza regularmente eventos especiales, como conciertos, proyecciones de cine y debates sobre temas relevantes para el mundo del arte y el diseño.

    Más Allá de la Arquitectura: Un Espacio de Innovación Constante

    La Bauhaus Dessau Foundation es mucho más que un museo; es un centro de investigación, un laboratorio de ideas y un espacio de encuentro para artistas e intelectuales. La fundación alberga una academia donde se ofrecen cursos y talleres sobre diseño, arquitectura y artes visuales, formando a la próxima generación de profesionales creativos. El edificio en sí mismo, con sus espacios multifuncionales y su atmósfera inspiradora, es un testimonio del legado Bauhaus – un lugar donde la creatividad florece y las posibilidades son ilimitadas.

    Visitar la Bauhaus Dessau Foundation es sumergirse en una experiencia transformadora que te invita a cuestionar tus propias ideas sobre el diseño, la arquitectura y el arte. Es descubrir cómo una escuela de vanguardia, nacida en medio de la crisis política y social, logró generar un impacto duradero en la cultura y la sociedad, inspirando a generaciones de artistas e intelectuales a perseguir sus sueños con pasión y determinación.

    Dónde leer más

    Consíguelo en línea

    Código QR que enlaza con la página de descarga de CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM

    wahooart.com/es/art/download/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/

    Cómo citar esta obra

    MLA
    Ehrlich, Franz. CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. 1959, Bauhaus Dessau Foundation. https://wahooart.com/es/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/
    APA
    Ehrlich, Franz (1959). CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM [Painting]. Bauhaus Dessau Foundation. https://wahooart.com/es/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/
    Chicago
    Franz Ehrlich. CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. 1959. Bauhaus Dessau Foundation. https://wahooart.com/es/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/
    Harvard
    Ehrlich, Franz (1959) CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM. Bauhaus Dessau Foundation. Available at: https://wahooart.com/es/art/franz-ehrlich-construction-schedule-for-the-most-favourable-impl-D4RDXE-en/

    Observa de cerca

    CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM — Franz Ehrlich

    Observa con atención

    Responda con sus propias palabras. Aquí no hay respuestas incorrectas, solo respuestas que pueda explicar.

    1. ¿Qué es lo primero que le llama la atención y por qué?
    2. ¿Qué colores o formas crean la atmósfera, y cuál es esa atmósfera?
    3. Nuestro catálogo clasifica esta obra bajo: construction plan, tv studios, investment project. ¿Está de acuerdo? ¿Qué añadiría o qué eliminaría?
    4. Vuelva a consultar TERCER PISO (Diseño para una representación extranjera de la RDA. Plano), anteriormente en esta guía. Mencione dos elementos que comparta con esta obra y uno que sea diferente.
    5. Franz Ehrlich tenía unos 52 años cuando se realizó esta obra. ¿Qué elementos de la misma parecen reflejar la etapa creativa de un artista a esa edad?

    Tu respuesta

    Escriba un breve párrafo sobre esta obra de arte. Utilice los datos de las secciones anteriores de esta guía y sus respuestas anteriores.

    Preguntas y respuestas

    ¿Puedo usar la realidad aumentada para ver "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" de Franz Ehrlich en mi habitación?

    "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" cuenta con una vista previa en realidad aumentada: la página de Vista previa en RA de la obra permite visualizarla en su propio espacio mediante un dispositivo compatible.

    ¿Con qué técnica se realizó "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM"?

    La técnica de "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" de Franz Ehrlich es Ink On Paper. Las reproducciones pretenden recrear la apariencia de esta técnica.

    ¿Qué sentimiento transmite "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" de Franz Ehrlich dentro de Bauhaus?

    "CONSTRUCTION SCHEDULE FOR THE MOST FAVOURABLE IMPLEMENTATION OF AN INVESTMENT PROJECT TV STUDIOS FOR 4-HOUR PER WEEK PROGRAM" transmite un tono emocional Reflective dentro del movimiento Bauhaus.